Alright, as promised, I’ve decided to share our list of boat projects for this season. We’re by no means finishing this entire list in the next week but will finish them within the 6-12 months or however long we’re living on the boat this time around. I’m also very positive that more things will be added to this list but for now, here it is!
- Add Maserater (Tharon)
- Reseal/Rebed Hatches & Windows (Both)
- Rebuild Head – Gaskets & Seals (Tharon)
- Fix Bolt on Alternator (Tharon)
- Mast Drainage (Both)
- Tear on Bimini/Dodger (Mary)
- Install Board for Jerry Cans (Mary)
- Teak & Holly Wood Work (Both)
- Stuffing Box (Contractor)
- Fix Front Cradle Lines (Mary)
- Wax Gel Coat (Both)
- Service Winches (Mary)
- Tighten Screws & Rebed Stanchions (Both)
- Remove Wooden Panel & Disc (Tharon)
- Davits – Fiberglass Repair (Both)
- Replace VHF Cable (Tharon)
- Install Deck Fitting for Wirie Pro (Tharon)
- Clean Transmission Case (Tharon)
- Replace Engine Mounts (Contractor)
- Repair Prop Strut (Contractor)
- Fix Anchor Light (Both)
- Back Plate & Cable Tie for Mast (Tharon)
- Check ALL Through Hulls (Mary)
- Tune Up Steering Cable (Tharon)
- Repaint Hull (Both)
- Inflate Dingus (Mary)
- Wash Deck + Cockpit (Mary)
- Spray Wash Hull (Both)
- Wax Hull (Both)
- Clean Bilge (Both)
- Clean Cushions (Mary)
- Sweep/Mop (Mary)
- Organize Lazarettes (Mary)
- Disinfect Setes (Mary)
- Oil Teak (Mary)
- Polish Dorades (Mary)
- Clean Fridge (Mary)
- Clean Cabinets (Mary)
- Cutlass Bearing (Contractor)
- Shaft Alignment (Contractor)
- Are Insurance & Documents in Order? (Mary – Document Attached)
- Provision (Mary – Chart Attached)
- Order Things & Parts (Mary – List Attached)
Want access to all my sailing documents & organization? Contact Me – HERE
In addition to getting organized around which projects we have to take on, I decided to take pictures of the current state of Tipsy Gypsy. Lots to do so why not have some progress shots!?
Wish us luck! Cheers & thanks for reading 🙂